Klinikum Konstanz

back

Klinikum Konstanz

 

Ground-breaking ceremony on 08.02.2013

 

2014 - 2018

New functional building:
Internal medicine, emergency surgery, general surgery, radiology, IMC, intensive care ward (24 beds), interdisciplinary reception room and ward, physiotherapy with mobility bath, central sterilization unit, A & E, 10 operating theatres, ultrasonic unit, cardiology, endoscopy, gastroenterology, heliport above 4th floor

 

2014 - 2018

New building Vincentius-Hospital
Basic orthopaedics care (72 beds)

 

Ground-breaking ceremony on 08.02.2013

 

2014 - 2018

New functional building:
Internal medicine, emergency surgery, general surgery, radiology, IMC, intensive care ward (24 beds), interdisciplinary reception room and ward, physiotherapy with mobility bath, central sterilisation unit, A & E, 10 operating theatres, ultrasonic unit, cardiology, endoscopy, gastroenterology, heliport above 4th floor

 

2014 - 2018

New building Vincentius-Hospital
Basic orthopaedics care (72 beds)
Rehabilitation ward orthopaedics (24 beds)

 

2017 - 2018

Redesign in existing structure, construction stage 3
Anaesthesia, urology, gynaecology/obstetrics, neonatology, pain therapy, dialysis, head centre (ENT, ophthalmology, oral and maxillo-facial surgery), pharmacy, laboratory

In total:
Net area          14,000 m²
GFA                  52,711 m²
Net volume  201,443 m³

 

2008 - 2009

Medical centre Konstanz
Design and functional tender

Net volume  18,000 m³

 

2008

Following damage after fire:
New building for 6 operating theatres as makeshift in a modular construction method (within 4.5 months)

 

2007

Assignment according to VOF procedure
Optimisation of the existing scheme